Aya Gold & Silver updated Boumadine study: after-tax NPV more than doubles to $3.5 billion
Aya Gold & Silver released an updated preliminary economic assessment (PEA) for its Boumadine project in Morocco, showing an after-tax net present value (NPV 5%) of $3.5 billion at base case prices, up from $1.5 billion in the 2025 PEA. The study also shows a 93% after-tax IRR, a 0.7-year payback and an initial capital cost of $463 million. The study is preliminary, includes inferred resources, and gives no certainty the project will be built as described, so its results depend heavily on higher assumed metal prices.
Key points
- After-tax NPV (5%) of $3.5 billion at base case prices, versus $1.5 billion in the 2025 PEA
- After-tax IRR of 93% and payback of 0.7 years at base case; initial capital expenditure of $463 million
- Base case gold price assumption of $3,500/oz, versus $2,800/oz in the 2025 PEA
- Mine life extended to 14 years from 11, with 3.9 Moz AuEq production over life of mine
The filing
Written by AI on Nov 23, 2026, 1:37 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on September 9, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.