Chilwa Minerals Nakombe drilling returns 0.315% niobium over 57 metres from surface
Chilwa Minerals furnished an Australian Stock Exchange announcement on drilling at its Nakombe target in Malawi, reporting laboratory assays that confirm niobium mineralisation along a 270-metre strike length. The filing reports exploration results only, with no revenue, earnings or guidance figures, and the company plans a maiden Mineral Resource Estimate for May–June 2027.
Key points
- Hole MPYDD009 returned 57 metres at 0.315% Nb₂O₅ from surface, including 14 metres at 0.426% Nb₂O₅
- Hole MPYDD015 returned 22 metres at 0.243% Nb₂O₅ from 349.5 metres downhole
- Six holes remain on the Southern Nakombe target, targeted for completion before the end of 2026
- A maiden Mineral Resource Estimate is provisionally planned for release in May–June 2027
The filing
Written by AI on Nov 23, 2026, 1:18 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on October 30, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.