Collective Mining drills 154.30 m at 12.66 g/t AuEq at Apollo's Ramp Zone
Collective Mining reported assay results from four directional drill holes at the Ramp Zone of its Apollo deposit in Colombia. Hole APC174-D4 returned its broadest high-grade intercept to date there, with local grades above those in the current Mineral Resource estimate, and the company says it is fully funded for its 2026 drilling program. The results are exploration data only and do not update the Mineral Resource.
Key points
- APC174-D4 intersected 154.30 m @ 12.66 g/t AuEq from 1,208 m below surface, including 30.45 m @ 39.01 g/t AuEq
- The hole ended in mineralization at 601.95 m down hole because the rig reached its rod capacity; follow-up drilling with higher-capacity rigs is planned
- Construction of a roughly 3-kilometer underground exploration adit is expected to start this month; the Ramp Zone is to be drilled to sea level in 2027
- An updated Mineral Resource is expected between Q4 2027 and Q1 2028, and assays for 71 drill holes at Guayabales are outstanding
The filing
Written by AI on Nov 23, 2026, 1:26 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on November 3, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.