GoldMining files technical report with positive PEA for São Jorge gold project in Brazil
GoldMining filed a NI 43-101 technical report including a preliminary economic assessment (PEA) for its São Jorge gold project in Pará State, Brazil. The PEA models an after-tax NPV at a 5% discount rate of $532 million and an IRR of 42.4% at a base case gold price of $3,500 per ounce. The study is preliminary, relies partly on inferred resources, and carries no certainty that its results will be realized.
Key points
- After-tax NPV 5% of $532 million and IRR of 42.4% at $3,500/oz gold; $836.8 million and 58.6% at $4,400/oz
- Initial capital estimated at $202 million, including a 25% contingency; LOM All-In Sustaining Cost of $1,464/oz
- Average production of 51,250 oz per year over a 10.6-year life of mine; company plans to start pre-feasibility studies
The filing
Written by AI on Nov 23, 2026, 1:38 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on July 22, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.