Guardian Metal Tempiute drilling hits 92.0m at 0.34% WO3; underground work to start
Guardian Metal reported assay results from the first four holes of its ongoing Phase II drilling at its Tempiute tungsten project in Nevada, including 92.0m at 0.34% WO3. Based on these results and visual observations from 24 more holes awaiting assay, the company decided to rehabilitate historical underground workings so underground drill rigs can be mobilized. The filing gives no cost or funding figure for this work, and the results are exploration data rather than a resource estimate.
Key points
- TP26-046 intersected 92.0m at 0.34% WO3 from 102.5m, including 12.7m at 0.53% WO3 from 170.5m
- Phase II campaign: 28 of a planned 46 diamond drillholes completed; assays pending for 24 holes
- Underground rehabilitation contractor engaged; works expected to start in October 2026
- Phase I regional program: 20 of 41 diamond drillholes intersected strong tungsten mineralization
The filing
Written by AI on Nov 23, 2026, 2:07 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on September 21, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.