Innovation Beverage Group's BlockFuel starts gas-powered computing near Stillwater
Innovation Beverage Group's approximately 51%-owned subsidiary BlockFuel Energy said it is advancing permits for the Steinman #1-23 well, with drilling expected to start in early December 2026, and has begun operating its first natural gas-powered computing and data mining equipment near Stillwater, Oklahoma. The filing furnishes a BlockFuel press release and restates that the proposed merger with IBG, which would rename IBG BlockFuel Energy Limited, still needs required approvals. No financial results or dollar figures were reported.
Key points
- Steinman #1-23 drilling is expected to start in early December 2026, subject to regulatory approvals, site preparation and contractor availability.
- The well is intended to test the Mississippian formation at about 4,700 feet; a deeper Wilcox test at about 5,100 feet is under evaluation.
- The initial gas-to-compute equipment is installed and operating; BlockFuel says returns depend on computing output relative to operating costs.
- The proposed merger with IBG remains subject to required approvals, including Nasdaq approval of the combined company's listing application.
The filing
Written by AI on Nov 23, 2026, 1:18 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on November 3, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.