IMC Rare Earths starts deeper drilling and WSP-led ISR field trials at Brazil project
IMC Rare Earths announced that diamond drilling at 29 Block D plateau locations will begin in mid-November 2026 to test mineralization below the 30-meter limit of existing auger drilling. WSP is leading an in-situ recovery field program at Block A, with injection testing targeted for Q1 2027; the release describes these programs as steps toward a possible 2027 resource assessment, but it does not report new financial results or a resource estimate.
Key points
- Diamond drilling at 29 Block D plateau locations starts in mid-November, extending about 5-10 meters into bedrock
- WSP leads the Block A ISR field program; injection testing is expected in Q1 2027 and 37 groundwater monitoring wells are being installed
- University of Brighton is testing 16 Block D samples; the release says earlier laboratory results are not demonstrated field-scale recoveries
The filing
Written by AI on Nov 23, 2026, 1:18 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on November 5, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.