Indonesia Energy reports K-29 oil output; WK-5 well rig-up underway at Kruh Block
Indonesia Energy said its president led a delegation to the Kruh Block in Sumatra to mark oil production from the recently drilled K-29 well. The company said site setup for the WK-5 well is underway and spudding is expected by the end of October 2026, but the filing gives no production volumes, revenue or cost figures.
Key points
- K-29 well was drilled to approximately 3,400 feet and is producing about 60% oil with a 40% water cut, sold to Pertamina
- WK-5 well is planned to a depth of approximately 5,200 feet and is designed to test additional formations, including a potential natural gas-bearing formation
- Company plans a hydraulic fracturing operation on K-29 to maximize production, using the drilling rig already mobilized at the site
- WK-5 spudding is anticipated by the end of October 2026
The filing
Written by AI on Nov 23, 2026, 1:18 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on October 6, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.