Nicola Mining reopens two portals at Treasure Mountain silver mine, targets 2027 restart
Nicola Mining reported that an independent inspection by McElhanney Ltd. found the Treasure Mountain Silver Mine in generally better condition than expected after about 13 years of inactivity, with no conditions seen that would prevent the project from advancing to the next evaluation stage. The company intends to recommence operations in 2027, but the filing contains no financial results, cost estimates or funding details, so shareholders have no figures yet on the cost or timing of a restart.
Key points
- Inspection on July 27, 2026 covered Portal 1 (Level 1) and Portal 2 (Level 2) by McElhanney Ltd.
- Both principal portals remain accessible, and much of the historical underground infrastructure remains in place.
- Localized rehabilitation, scaling and support replacement will be required, particularly near the Portal 2 entrance.
- Next phase includes a detailed geotechnical and rehabilitation assessment, followed by surveying and mapping of the workings.
The filing
Written by AI on Nov 23, 2026, 1:36 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on September 17, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.