Standard Lithium files positive PEA for Franklin project; $5.9 billion pre-tax NPV
Standard Lithium, with partner Equinor, filed a Preliminary Economic Assessment for its Franklin project in East Texas. The study models up to 70,000 tonnes per year of battery-quality lithium carbonate and an unlevered pre-tax NPV of $5.9 billion, and recommends advancing to a Preliminary Feasibility Study, which the company targets for 2027.
Key points
- PEA filed on SEDAR+ for the Franklin project, with a 20-year modelled operating life and up to 70,000 tonnes per year of lithium carbonate capacity.
- Unlevered pre-tax NPV of $5.9 billion and IRR of 25.7%, with a 3-year payback, on a 100% ownership basis; Standard Lithium's economic interest is 55%.
- Initial production could begin in the early 2030s; the PEA is preliminary and does not model a bromine facility in its base case.
- Principal recommendation is to advance to a Preliminary Feasibility Study, with completion targeted in 2027.
The filing
Written by AI on Nov 23, 2026, 1:26 AM ET, from this filing only. Written later: this filing was briefed after the fact, when past filings were added to the site, so the brief may be read with hindsight; the filing itself is the record of what was known on October 20, 2026.
Briefs are written by AI from the filing text and can contain mistakes — open the filing before acting on anything. Impact (1-5) and tone are the AI's reading of the filing for shareholders, not a price forecast. Not investment advice.